Could the workshop space you don't use work for someone else?
A joiner with materials to cut. An upholsterer with work to keep dry. A small business that needs room for its tools. The same building will not suit every activity.
We look at the building, the work proposed and the hours you would allow. You decide which uses are worth exploring.
The work determines what the space needs.
A quiet storage use and a business running machinery ask different things of the same workshop. Door clearance, floor condition, ventilation and the available power can change which options are worth considering.
Be clear about the space that stays yours.
Tell us whether you could offer the whole building or a defined part, which entrances and facilities would be shared, and when you need access. Those details belong in the proposed arrangement from the start.
What makes a use fit here?
- Access and deliveries:
- door dimensions, vehicle turning, loading space and the times stock or equipment would arrive.
- Power and facilities:
- what services are available, what the activity requires and which details need a qualified specialist.
- Activity and neighbours:
- working hours, noise, dust, fumes, visitors and any activities you would exclude.
- Condition and responsibilities:
- the floor, roof and security, with the relevant safety, permission, insurance and maintenance checks.
Three workshop possibilities to investigate.
Illustrative possibilities, not current enquiries or assessed sites.
- Joinery or making:
- do the space, power and hours suit the machinery, materials and work proposed?
- Upholstery or equipment repair:
- can the business work within your access rules, with the necessary facilities and activity-specific checks?
- Shared bench or work space:
- can areas, storage, equipment and responsibilities be kept clear for everyone using the building?
The checks before anyone starts work.
The Passport records the information available and the gaps. It does not certify the building, electrics or equipment. Planning, structural, fire, legal or other specialist advice may be needed before a business starts using the space.
GOV.UK: When is permission required?Tell us what is there.
Rough dimensions, the services you know about and the hours you would allow are enough to start. A free Asset Passport follows our first conversation, by a date we agree.
Detailed Passport intake
Start the detailed Passport intakeWe assess land across Northern England, with first arrangements in the North East. Elsewhere in the UK? Tell us anyway.